Engineering compliance and oversight is handled by JVA Consulting Engineers. Each project is carried out under the direction of the Town Manager and exhibits a progessional level of work relative to the design and construction of public improvements such as new sidewalks, reviews of subdivision and development projects for compliance with Town codes, ordinances and regulations.Engineering is responsible for reviewing and issuing street and road cut permits, as well as creating and completing the annual capital improvements project list.All work within Town right-of-way or new subdivisions must comply with the Town's Standards and Specifications for Design and Construction.Standards and Specifications for Design and Construction:Chapter 1: General ProvisionsChapter 2: Submittal Procedures and Requirements for Construction PlansChapter 3: Construction and Grading Permits, Permit Procedures, and Bonding RequirementsChapter 4: Roadway Design and Technical CriteriaChapter 5: Pavement Design and Technical CriteriaChapter 6: Private Driveway and Emergency Access Requirements and CriteriaChapter 7: Off-Street Parking and Loading Space RequirementsChapter 8: Roadway Utility LocationsChapter 9: Trench Backfill, Compaction, and ResurfacingChapter 10: Storm Drainage CriteriaChapter 11: Erosion Control CriteriaChapter 12: Roadway Inspection and Testing Proecures and Construction GuidelinesChapter 13: Record DrawingsChapter 14: Acceptance Procedures and RequirementsFlood Plan Maps for Winter Park (2008 Update):Panel 1Panel 2Panel 3Panel 4Panel 5Panel 6